Wellesley's Next Condos, Project by Project

November 19, 2026

In March, The Swellesley Report found the office building Roger Babson put up in 1919 at 16 Laurel Avenue fenced off, waiting to become 28 condominiums across Washington Street from the Wellesley Hills train station. The developer said he hoped to start digging over the summer and estimated 18 months of construction. A summer start followed by 18 months of work would have put the first owners in the building in early 2028.

That timeline matters to anyone in Wellesley planning a move from a house to a condo. Read on their own, the town's condo figures for 2025 look like a cooling market. They describe a market between two waves of construction. The last wave of luxury buildings has sold. Most of the next wave is still in hearings or early stages. A buyer who wants a new Wellesley condo in the next year or two is choosing between a short resale shelf now and buildings whose own timelines run into 2028 and beyond.

The 2024 wave, and what it did to the 2025 numbers

Two developments decided most of Wellesley's recent condo story. Terrazza on Linden Street has 35 condos plus four affordable units. The Bristol on Weston Road has 26 condos plus two affordable units. In February 2024, Terrazza was aiming for spring move-ins, with units described from about $1 million to more than $3 million. By August 2024, The Swellesley Report described buyers "forking over multi-millions" to move into both newly opened buildings. Together they hold about 70 condos, many priced from $2 million to more than $3 million.

Those closings fill the 2024 column of the comparison everyone quotes. Elaine Bannigan's annual Pinnacle Report, published in The Swellesley Report in February, counted 43 Wellesley condo sales in calendar 2025, down from 80 in 2024. The 2025 median fell 20% to $1,445,000. Bannigan traced the drop to the completion of the newer luxury developments in 2024. That year, 36 condos closed above $2 million. In 2025, 10 did. In her words, the median drop "has absolutely nothing to do with appreciation or depreciation; it's just an indication of in which price ranges sales occurred."

The lower median, then, comes from which condos sold in 2025. The expensive new units had already closed in 2024, so the 2025 count is mostly older resales. That changes what a downsizer should take from it. Wellesley's top tier of new condos has no fresh supply, and the median says nothing about whether prices for any one kind of unit went up or down.

A seven-unit shelf at the start of 2026

The same report counted condo inventory at seven homes as of January 31, 2026, half the figure from a year earlier. The market had absorbed most of the supply from the previous two years. On that same date, 29 single-family homes were on the market, about double the year before.

Those two January counts are nearly ten months old now. Still, they describe the squeeze a Wellesley downsizer was in at the start of this year: more houses competing on the selling side, and far fewer condos to choose from on the buying side. One finished building has come to market since the 2024 wave. The Albion, a 24-unit condo complex at the dead end of Stearns Road between Route 9 and the Sprague Elementary School fields, is listed as complete, and its affordable-unit lottery was held in September 2025. The Albion was first proposed at 36 units.

For the town as a whole, Wellesley added 75 homes in 2025, a 0.77% increase in its housing stock. Growth that small means every project below makes a real difference to the condo supply.

The next wave, by latest public record

The Swellesley Report keeps a running list of multi-family projects, last updated in July. The table below shows the ownership projects on it, each with the most recent dated step on public record.

Project Location Homes Latest dated step
The Bellwether 192-194 Worcester St. and 150 Cedar St. 34 condos, 7 affordable Cleared ZBA site plan review, September 2025
The Laurel 16 Laurel Ave., Wellesley Hills 28 condos, 6 affordable Draft town approval conditions dated May 11, 2026
592 Washington St. Former funeral home site 19 condos On the ZBA agenda Nov. 5, 2026, continued from Oct. 15
10 Railroad St. Off Linden St., near Wellesley Square station 8 townhomes, 2 affordable Design Review Board, April 29, 2026
136-140 Worcester St. Route 9 east 15 condos, 3 affordable Presented to Planning Board, June 15, 2026

The Bellwether is the Encore Properties plan on Route 9 and Cedar Street. When it made it through approvals in September 2025, the developer expected demolition by year-end and construction to begin in early 2026. Encore is also building two large single-family homes at 169-171 Washington Street, the former DiBona dental office site.

The Laurel is the conversion of a 39,000-square-foot office building by Babson House LLC into a four-story building, with 56 underground parking spaces and 20 more above ground. Of its 28 homes, 22 are market rate.

At 592 Washington Street, plans filed at the start of 2026 describe a three-story, 19-unit condo project of about 50,000 square feet in total. The developer's submitted materials gave underground parking counts anywhere from 19 to 36 spaces. The Swellesley Report called it a high-end complex. Its Zoning Board of Appeals hearing has carried over from October 15 to November 5.

The two smaller projects are aimed at different buyers. At 10 Railroad Street, the plan is eight attached townhomes of about 3,800 square feet each, built on a parking lot along the tracks near the Wellesley Square station. At 136-140 Worcester Street, the plan is 15 two- and three-bedroom condos of 1,800 to 2,800 square feet. That plan is a smaller version of an earlier idea for a 40-unit apartment complex on the same land.

Two larger sites are further back. At 49 Walnut Street, along the Charles River in Lower Falls, a developer is again seeking multifamily housing after Special Town Meeting rejected an earlier zoning approach in 2024. MassBay Community College is looking to sell land across from its Oakland Street campus for multifamily housing.

Where the new buildings sit

The next wave is clustered at two of Wellesley's three commuter rail stops. In 2024, Town Meeting voted for an MBTA Communities plan centered on Wellesley Square, Wellesley Hills and the William Street area around The Nines. The Laurel and 10 Railroad Street both sit within walking distance of a station.

Station parking differs a lot between those stops. The town's station directory, updated in May, lists 224 spaces at Wellesley Square, 190 at Wellesley Farms and 55 at Wellesley Hills, the station at 341 Washington Street. A Laurel owner would be a short walk from the station with the smallest lot. At Wellesley Square, accessible mini-high platforms opened in February 2025.

What the gap means for timing a downsize

Put the dates together and the timeline is clear. Wellesley's newest finished condos are the 2024 buildings and The Albion, and those sales are already counted. The Laurel's March forecast, kept to the month, would have meant move-ins in early 2028. The Bellwether's start date has already passed, so its completion depends on when the work began. The other projects are still before town boards. Anyone selling a Wellesley house this winter will sell into the same more crowded single-family market the January count showed. When they go to buy, they will choose from older resale condos, a few recent units that come back on the market, and new projects they would have to wait for.

For many sellers, the order of the two transactions now matters more than the price of either one. Holding out for a new unit can mean a temporary rental or a longer stay in the house. Buying a resale condo now means choosing from a much smaller set of options. Our Wellesley condo and townhome overview covers the existing buildings, and a home valuation shows where your house fits on the selling side.

Questions downsizers bring up

Did Wellesley condo prices fall 20% in 2025? The median fell 20%, to $1,445,000 for calendar 2025. The Pinnacle Report put that down to the mix of sales, with 10 closings above $2 million in 2025 compared with 36 in 2024, and said it does not reflect appreciation or depreciation.

Do the new projects include affordable units? Most of them do. The Bellwether plans seven, The Laurel six, 136-140 Worcester Street three and 10 Railroad Street two. The January coverage of 592 Washington Street mentioned no affordable units.

Is more coming near The Nines? The Nines, a 350-unit apartment complex, sits in the Wellesley Park district on William Street where Route 9 meets I-95. As of late summer 2026, no further plans had been announced.

If you are weighing whether to sell your Wellesley house now or wait for one of these buildings, Leah Hart would be glad to talk through how these project dates line up with your own plans. Let's Connect.